ClaimSafe Contractor Command: Project Alpha

✓ RR CREDENTIALS VERIFIED

RR Verified

Manual Vetting Complete: Michael McNeer

PAID (10%)

1. Startup Handshake

Mobilization funds released via Stripe Connect.

LOCKED

2. Material Draw (45%)

Action Required: Submit "Driveway Handshake" Photo.

*GPS and Timestamp verified via ClaimSafe Verification Engine.

WAITING

3. Final Release (40%)

Pending Post-Install Audit and Homeowner Handshake.